undefined
undefined
undefined
undefined
undefined
+
  • undefined
  • undefined
  • undefined
  • undefined
  • undefined

ZJE filter press feed pump

Blindly starting the motor is strictly prohibited. Only after confirming the correct direction of the motor can the coupling be installed and cancelled.
  • Product Description
  • Pump installation

    Blindly starting the motor is strictly prohibited. Only after confirming the correct direction of the motor can the coupling be installed and cancelled.

    1. Remove the grease and dirt from the base and place it on the foundation.

    2. Insert the anchor bolts into the foundation holes of the base, attach a nut above and below the base holes of the anchor bolts, and place a support rail or wedge iron (with a support height of 50 millimeters) under the base to align the pump inlet and suction pipe flanges.

    3. Use a spirit level to roughly adjust the levelness of the pump in both vertical and horizontal directions on the inlet and outlet flanges.

    4. For the first grouting, pay attention to ensuring that the anchor bolts are vertical and do not touch the equipment.

    5. After the concrete is completely dry and solidified, tighten the upper and lower nuts of the base evenly, and then perform the second grouting.

    6. Remove the coupling cover and check the gap between the couplings. There should be a certain gap between the couplings, usually 4 millimeters. Check if the pump shaft and motor shaft are concentric, and adjust them with a thin gasket. The difference between the outer circle of the coupling should not exceed 0.1 millimeters, and the maximum and minimum difference between the end face clearance should not exceed 0.3 millimeters.

    7. The suction pipe diameter should be the same as or slightly larger than the inlet diameter of the pump, so as to avoid cavitation of the pump and prevent the slurry from depositing in the pipeline.

    8. To minimize the deposition of slurry in the pipeline and snail shell, a discharge valve (the diameter of the valve depends on the particle size of the medium) should be installed below the parallel pipe section between the suction pipeline and each gate for discharge after parking.

    9. For the convenience of pump maintenance, an inlet valve should be installed with a diameter equal to the suction pipe diameter of the pump. Expansion joints should be installed between the suction inlet and suction pipe of the pump for easy disassembly and assembly.

    10. The discharge pipe diameter should be the same as or slightly larger than the outlet diameter of the pump.

    11. The pipeline should have its own support, and the weight of the pipeline should not be added to the pump to avoid damaging it.

    12. When installing the pump position, try to keep the pump as low as possible below the liquid level to achieve the best performance.

    Installation Guide for ZJE Filter Press Feed Pump

    Pump usage, maintenance, and upkeep

    ① Start up
    1. Check if the lubricating oil level is at half of the oil level gauge (the lubricating oil has been added before leaving the factory)
    2. If it is a double end mechanical seal (water tank structure), clean water (or engine oil) should be injected into the water tank to the specified water level first, and then the water tank should be sealed to circulate the water as required.
    3. Start the motor and ensure the correct direction of rotation before installing the coupling pin. Do not blindly start the motor to prevent the impeller from falling off.
    4. Open the inlet pipeline valve, and after the water pump is completely filled with water (for the sealed pump, check whether the sealed water tank or external water injection is normal), connect the power supply, and gradually open the outlet pipeline valve when the pump reaches normal speed. It is strictly prohibited to turn on all pumps before starting them.
    ② Stop it
    Turn off the motor. If the pump has been out of service for a long time, the night body inside the pump should be drained. To prevent the pump from freezing in winter.
    ③ Repair and maintenance
    1. Regularly replace with new oil, with a cycle of 2-3 months.
    2. When sealing the packing, regularly check the leakage of the shaft seal water. If the leakage is severe, adjust the packing gland or replace the new packing in a timely manner to prevent the external water from leaking in droplets.
    3. When using a double end mechanical seal, regularly check the water level and turbidity of the water tank, and add water or replace it with clean water in a timely manner.
    4. If the pump is not used for a long time in winter, the inlet valve should be closed, and the pump should be started and run idle for a few minutes to remove residual slurry from the pump to avoid freezing and cracking of the pump body.

    Material configuration

    Material and component names Routine stainless steel
    Inlet pump body ZG270-450 304
    Outlet pump body I Cr27 304
    Outlet pump body II Cr27 304
    Impeller I Cr27 304
    Impeller II Cr27 304
    Guard plate Cr27 304
    Axis 45 304
    Bushing 45 carburizing 304
    Expeller  Cr27 304
    Bearing body HT250 HT250

     


     

    Sealing form

    According to different job requirements and the working conditions of the pumped medium, different sealing forms can be selected

    Packing seal double end mechanical seal

    Containerized single mechanical seal

    Pump structure diagram

    Disassembly and assembly of ZJE filter press feed pump

     

    Disassembly of pump and assembly of pump

    Loosen the flange bolts of pump body 1 and outlet pump body I, and remove the bent pipe pump. The assembly and disassembly sequence is basically opposite,
    2. Loosen the pull rod nut and remove the pump body II. The disassembly ring is installed in place after installing the water blocking plate
    3. Loosen the disassembly ring (loosen the three hexagon socket bolts on the disassembly ring to separate it)
    Remove impeller II, pump body I, impeller I, and guard plate in sequence
    From the direction of the pump, rotate impeller I counterclockwise to remove it
    Loosen the connecting bolts between the cover plate and the inlet pump body, remove the fish plate, auxiliary impeller, and spacer sleeve
    Loosen the connecting nut between the inlet pump body and the bracket, and remove the inlet pump body (including the seal)
    Disassembly and assembly of bearing body components

     

    Disassembly of bearing body components

    1. Loosen the round nut, remove the bearing cover, bearing sleeve, and oil seal
    2. Loosen the bolts between the front cover of the bearing and the bearing body, and remove the water blocking plate and the front cover of the bearing
    3. Pull out the shaft from the back cover direction and make diagonal contact with the bearing and cylindrical roller bearing,
    Assembly of bearing body components
    The installation sequence is opposite to the disassembly sequence
    Dismantling and assembly of packing seals
    Dismantling of packing seal:
    Loosen the nut, remove the packing gland, packing, and shaft sleeve
    Assembly of packing seal:
    Reverse the disassembly sequence

    Disassembly and assembly of containerized single mechanical seals

     

    Dismantling of mechanical seals for container bills

    1. Loosen the fastening bolts between the machine seal and the shaft sleeve
    2. Loosen the nuts of the gland and the inlet pump body, and extract the machine seal
    Assembly of mechanical seals for container bills
    Reverse the disassembly sequence

     

     

    Dismantling of dual mechanical seals

    1. Loosen the nuts of the water tank and machine seal cover
    2. Loosen the nuts of the machine seal box and machine seal cover
    3. Loosen the fastening bolts of the dynamic ring and shaft sleeve, and remove the dynamic ring
    4. Loosen the machine seal box and the nut of the golden water pump body, and remove the machine seal box (along with the static ring)

    Cause and solution of malfunction

    Fault Original image Solution
    The pump does not produce water, and the pointers of the pressure gauge and vacuum gauge jump violently The pump is not filled with water, and the suction pipeline is blocked or not fully opened. The inlet pipeline of the pump, instrument or packing chamber is leaking air Fill the pump with water
    Open the inlet valve and clean the pipeline blockage
    Block the leaking part and check if the packing is moist or tightly compressed
    The pump does not produce water, and the vacuum gauge indicates high vacuum The imported valve is not open or blocked, and the resistance in the suction pipeline is too high or the suction height is too high due to blockage Open the inlet valve or clear the sediment
    Improving the design of the inlet pipeline or dredging
    Reduce installation height
    The pump is not producing water, and the pressure gauge shows pressure The resistance of the water outlet pipeline is too high
    Impeller blockage
    Insufficient rotational speed
    Check and adjust the water outlet pipeline
    Clean the impeller
    Increase the pump speed
    The pump is not rotating The snail shell is silted up by solid sediment Clean up blockages
    Insufficient traffic Impeller or inlet/outlet pipeline blockage
    Severe impeller wear
    The speed is lower than the specified value
    Unreasonable installation of the pump or leakage of the inlet pipeline
    The conveying height is too high, and the resistance loss inside the pipe is too large
    The inlet valve is too small and has obstacles
    Air leakage at the feed inlet
    Unreasonable pump selection
    Clean the impeller or pipeline
    Replace the impeller
    Adjust the speed
    Reinstall or block the air leakage
    Reduce the conveying height or decrease resistance
    Open the large valve
    Tighten the pressure cover
    Reselect
    The motor of the pump is overloaded The pump head is greater than the required head for the operating condition, and the operating condition point is shifted towards a higher flow rate
    When selecting the motor, it was not considered to compress the specific gravity packing too tightly
    Turn down the outlet valve, cut the impeller or reduce the speed to reselect the motor
    Adjust the packing gland nut
    pump vibration Pump cavitation occurs
    Impeller channel blockage
    The pump shaft and motor shaft are not concentric
    Loose fasteners or foundation
    Adjust the outlet valve, lower the installation height, and reduce the inlet resistance
    Clean the impeller
    Find the correct one again
    Tighten the bolts and reinforce the foundation

    Main technical parameters of direct drive

    Project

    model

    Speed

    r/min

    Traffic

    m3/h

    Head

    m

    Max

    shaft power

    KW

    Reference motor
    model

    power

    KW

    50ZJE-II 1480

    30

    40

    50

    58

    70

    76.0

    72.2

    66.1

    56.0

    43.5

    15 Y180L-4 22
    Y200L-4 30
    65ZJE-II 1480

    41.4

    55.2

    69.0

    80.0

    100

    76.0

    72.2

    66.1

    56.0

    43.5

    22.3 Y225S-4 30
    Y200L-4 37
    80ZJE-II 1480

    60.0

    80.0

    100

    115

    135

    76.0

    72.2

    66.1

    56.0

    43.5

    32 Y225S-4 37
    Y225M-4 45
    100ZJE-II 1480

    85.0

    113

    150

    169

    175

    73.3

    69.0

    62.5

    51.2

    44.0

    49 Y225M-4 45
    Y250M-4 55
    125ZJE-II 1480

    105

    140

    186

    245

    265

    73.5

    71.6

    68.6

    61.9

    48.5

    62.5 Y250M-4 55
    Y280S-4 75
    125ZJE-II 1480

    119

    159

    211

    279

    305

    80.0

    78.0

    74.8

    67.5

    52.9

    78.2 Y280S-4 75
    Y280M-4 90
    125ZJE-II 1480

    87.0

    116

    154

    203

    215

    91.8

    89.1

    85.7

    77.3

    60.6

    64.7 Y280S-4 75
    Y280M-4 90

About Us


Hebei Baixinda Industrial Water Pump Manufacturing Co., Ltd. is a professional manufacturer of new material equipment and wear-resistant spare parts integrating R&D, production, sales and service. It mainly serves industries such as mining, metallurgy, coal, power, environmental protection, chemical engineering and papermaking.
The company is committed to the research and application of high-performance ceramic wear-resistant and corrosion-resistant materials as well as ceramic composite materials to enhance the performance, reliability and service life of equipment, effectively save energy and reduce emissions, and improve the operation rate and operational efficiency of equipment. The new ceramic materials developed by the company have many advantages such as wear resistance, corrosion resistance, economy and environmental protection. They have partially replaced traditional metal materials, reduced the operation costs in industries such as mining, and achieved remarkable effects in energy conservation and environmental protection.

Assembly Workshop
Assembly
Filter press pump accessories
Mold
Casting
Finished goods warehouse
Finished product
150ZJ-I-C42 slurry pump tailings usage and installation site

Original manufacturer


Original manufacturer

Customer Inquiry

Factory quotation

Customer order

Factory production

Packaging and transportation

FAQ


Can you accept small quantities?

Yes, accept small quantity, fast delivery

Do you have pre-shipment inspection procedures?

Yes, we always test the products before delivery.

Can I take samples for testing?

Yes, samples can be sent for testing before bulk ordering.

When is the delivery time?

Inventory orders within 7-15 days, for oem and odm orders, the specific time depends on the actual situation.

What are the terms of payment?

Wire transfer or letter of credit, Western Union, Alipay, etc.

What is the minimum order quantity?

It depends on the product.

Product inquiry